18155199734

施工工艺

至臻优选·为您呈现
您的位置: 首页 > 越众施工 > 施工工艺
  • static/picture/point_ico_01.png static/picture/point_ico_01h.png
    金字塔精工

    Pyramid Craft

  • static/picture/point_ico_02.png static/picture/point_ico_02h.png
    国家二级施工资质

    National Class-B License

  • static/picture/point_ico_03.png static/picture/point_ico_03h.png
    隐蔽工程质保期内免费保修

    Free warranty within the warranty period of concealed works

八级质量管理体系
  • static/picture/quality_ico_01.png

    严格图纸审核机制

    Strict drawing review mechanism

  • static/picture/quality_ico_02.png

    统一材料管控机制

    Unified material control mechanism

  • static/picture/quality_ico_03.png

    质量信息管理系统

    Quality information management system

  • static/picture/quality_ico_04.png

    工地质量巡检机制

    Site quality inspection mechanism

  • static/picture/quality_ico_05.png

    施工标准规范机制

    Construction standard and specification mechanism

  • static/picture/quality_ico_06.png

    分部分项验收机制

    Acceptance mechanism of divisional and sub divisional works

  • static/picture/quality_ico_07.png

    贴心品质服务机制

    Intimate quality service mechanism

  • static/picture/quality_ico_08.png

    售后维护管理系统

    After sales maintenance management system

5大施工标准 · 打造行业典范

国家二级施工资质企业,领先行业的标准工艺

  • static/picture/technology_ico_01.png static/picture/technology_ico_01h.png

    开工进场放样标准

  • static/picture/technology_ico_02.png static/picture/technology_ico_02h.png

    水电工艺施工标准

  • static/picture/technology_ico_03.png static/picture/technology_ico_03h.png

    泥工工艺施工标准

  • static/picture/technology_ico_04.png static/picture/technology_ico_04h.png

    油漆施工工艺标准

  • static/picture/technology_ico_05.png static/picture/technology_ico_05h.png

    木工工艺施工标准

开工进场放样标准

Setting out criteria for entry

static/picture/5bd00d77ab16c.png
开工必须使用水平仪按照图纸进行放样工作

static/picture/5bd00d6b53b18.png
开工必须使用水平仪按照图纸进行放样工作

static/picture/5bd00d605cbb8.png
开工必须使用水平仪按照图纸进行放样工作

水电工艺施工标准

Hydropower construction standard

static/picture/5bc848960c95c.jpg
电线并线用美国IDEAL扭结式接线端子

static/picture/5bc8487d36593.jpg
所有线管、水管必须用管卡固定

static/picture/5bc84857de945.jpg
墙地面开槽必须弹线用切割机开槽

static/picture/5bc848363eaf7.jpg
配电箱必须配备总开关后配照明再配漏电保护器

static/picture/5bc8481abe62a.jpg
先弹线后再开槽,开槽时必须横平竖直

泥工工艺施工标准

Standard for construction of masonry

static/picture/5bc8493114108.jpg
在铺贴玻化砖和微晶石上墙时,必须用重型粘结剂铺设

static/picture/5bc84914c1e8e.jpg
先做防水层,地面做好防水层后再做24小时盛水试验

static/picture/5bc848fc6a859.jpg
地面与墙角处一体防水工艺

static/picture/5bc848cc7067f.jpg
厨卫新建墙体必需现浇止水梁

static/picture/5bc848b3e136a.jpg
新建门窗洞上必需用钢筋水泥过梁

油漆施工工艺标准

Paint construction technology standard

static/picture/5bc84985ecd05.jpg
干壁钉做隔氧处理

static/picture/5bc8496eed50c.jpg
阳角线垂直平整

static/picture/5bc84957ec5a2.jpg
油漆墙面阳角护角条工艺

木工工艺施工标准

Standard for woodworking process constructionm

static/picture/5bc849f7f354b.jpg
封好石膏板后,用砂纸将毛边打磨光

static/picture/5bc849df43146.jpg
吊木龙骨顶时必须加美固钉

static/picture/5bc849c1d8066.jpg
空调岀风口和回风口必须加固,再封上石膏板

static/picture/5bc849a8a38c7.jpg
用木龙骨吊顶前,必须先刷防火涂料